Project Completion Certificate (Ground Water)
Scheme ID: 8360402 Name of Scheme: NALPURA VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1950 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 12-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL WORK 50.64 MTR / 101.25 MTR NALPURA 29.075168 78.235935
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10 HP 500 LPM /40 MTR NALPURA 29.075168 78.235935
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 MTR NALPURA 29.07532 78.236035
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 140 0.502
2 HDPE PIPE PN-6 CLASS PE-100 110 0.139
3 HDPE PIPE PN-6 CLASS PE-100 90 0.141
4 HDPE PIPE PN-6 CLASS PE-100 75 0.249
5 HDPE PIPE PN-6 CLASS PE-100 63 5.000
HSC Connection
Sno. Total Nos.
1 321
Other Details
1.70
1.70
1.70
10-Jun-2024
11-Jun-2024