Project Completion Certificate (Ground Water)
Scheme ID: 8360403 Name of Scheme: RATANPUR KHURD VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2093 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Aug-2025 Actual Date of Completion (Capex): 01-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 4.28
2 HDPE PIPE PN -6: CLASS PE -100 75 0.37
3 HDPE PIPE PN -6: CLASS PE -100 90 0.42
4 HDPE PIPE PN -6: CLASS PE -100 110 0.07
5 HDPE PIPE PN -6: CLASS PE -100 140 0.14
HSC Connection
Sno. Total Nos.
Other Details
1.66
1.66
1.63
31-Jul-2025
01-Aug-2025