| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360404 | Name of Scheme: THURELA VILLAGE WATER SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2201 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2023 | Actual Date of Completion (Capex): 12-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 15.0 mtr /135.0 mtr | Thurela | 29.096372 | 78.22051 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump 10 hp | 500 LPM / 40 MTR | THURELA | 29.066372 | 78.22051 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 MTR | THURELA | 29.096363 | 78.220653 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 100 | 0.012 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 160 | 0.133 | |
| 2 | HDPE PIPE | 110 | 0.309 | |
| 3 | HDPE PIPE | 90 | 0.521 | |
| 4 | HDPE PIPE | 75 | 0.517 | |
| 5 | HDPE PIPE | 63 | 4.049 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 380 |