Project Completion Certificate (Ground Water)
Scheme ID: 8360406 Name of Scheme: BUDGARI GRAMPANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3112 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.17 Mt / 120.49 Mtr Budgari 29.54069 78.177094
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 15.00 HP 775 LPM / 47 Mtr Budgari 29.54069 78.177094
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 18.00 Mtr Budgari 29.54084 78.176955
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class 160 0.027
2 HDPE Pipe PN-6 Class 140 0.384
3 HDPE Pipe PN-6 Class 110 0.370
4 HDPE Pipe PN-6 Class 90 0.278
5 HDPE Pipe PN-6 Class 75 0.211
6 HDPE Pipe PN-6 Class 63 5.734
HSC Connection
Sno. Total Nos.
1 390
Other Details
1.97
1.97
1.97
08-Jun-2024
09-Jun-2024