Project Completion Certificate (Ground Water)
Scheme ID: 8360412 Name of Scheme: SINKRI BUZURG VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2215 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Nov-2022 Actual Date of Completion (Capex): 15-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 3.48
2 HDPE PIPE PN -6: CLASS PE -100 90 0.90
3 HDPE PIPE PN -6: CLASS PE -100 160 0.26
HSC Connection
Sno. Total Nos.
Other Details
1.73
1.73
1.71
15-Jan-2025
16-Jan-2025