Project Completion Certificate (Ground Water)
Scheme ID: 8360413 Name of Scheme: TIRPURI VILLAGE WATER SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1447 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 11-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 62.28 MTR / 101.25 MTR TIRPURI 29.101884 78.233012
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 5.0 HP 300 LPM / 40 MTR TIRPURI 29.101884 78.233012
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL/ 12 MTR TIRPURI 29.102016 78.233152
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 80 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 PE-100 110 0.017
2 HDPE PIPE PN-6 PE-100 90 0.421
3 HDPE PIPE PN-6 PE-100 75 0.201
4 HDPE PIPE PN-6 PE-100 63 5.142
HSC Connection
Sno. Total Nos.
1 265
Other Details
1.68
1.68
1.68
10-Jun-2024
11-Jun-2024