| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360439 | Name of Scheme: Mirjapur GP Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2800 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 23-Apr-2023 | Actual Date of Completion (Capex): 24-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 24.12/90.01 | MIRJAPUR | 26.313609 | 83.726629 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP | 650 | MIRJAPUR | 26.313609 | 83.726629 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 | 100 | 40 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 125 | 0.119 | |
| 2 | HDPE PIPE | 110 | 0.2952 | |
| 3 | HDPE PIPE | 90 | 0.7719 | |
| 4 | HDPE PIPE | 75 | 1.8508 | |
| 5 | HDPE PIPE | 63 | 6.8191 | |
| 6 | HDPE PIPE | 160 | 0.076 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 418 |