Project Completion Certificate (Ground Water)
Scheme ID: 8360451 Name of Scheme: PATTI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2048 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Mar-2024 Actual Date of Completion (Capex): 10-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.984
2 HDPE 75 0.235
3 HDPE 90 0.226
4 HDPE 160 0.023
5 HDPE 140 0.083
6 HDPE 125 0.545
HSC Connection
Sno. Total Nos.
Other Details
21030000.00
22122610.00
21598067.00
10-Mar-2024
01-Apr-2024