Project Completion Certificate (Ground Water)
Scheme ID: 8360536 Name of Scheme: Siyarampur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 5850 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Nov-2023 Actual Date of Completion (Capex): 22-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.14/169.71 Siyarampur 26.887687 83.359738
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 78/43 Siyarampur 26.88578 83.347912
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 300KL/16M Siyarampur 26.885792 83.347723
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.003 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.558 Completed
2 HDPE 75 5.226 Completed
3 HDPE 90 1.851 Completed
4 HDPE 110 1.168 Completed
5 HDPE 140 0.981 Completed
6 HDPE 160 0.212 Completed
7 HDPE 200 0.787 Completed
HSC Connection
Sno. Total Nos.
1 916
Other Details
3.42
0.00
3.37
21-Dec-2024
06-May-2025