Project Completion Certificate (Ground Water)
Scheme ID: 8360561 Name of Scheme: Mahura Kalan No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2730 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 12-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.01 Mtr/ 114.79 Mtr Mahura Kalan 27.235616 80.152864
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45Mtr Mahura Kalan 27.235616 80.152864
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/ 16 Mtr Mahura Kalan 27.235537 80.152906
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0243
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.132
2 HDPE Pipe PN-6, Class PE-100 75 3.696
3 HDPE Pipe PN-6, Class PE-100 90 2.382
4 HDPE Pipe PN-6, Class PE-100 110 0.554
5 HDPE Pipe PN-6, Class PE-100 125 0.180
6 HDPE Pipe PN-6, Class PE-100 140 0.506
7 HDPE Pipe PN-6, Class PE-100 160 1.039
HSC Connection
Sno. Total Nos.
1 302
Other Details
2.71
0.00
2.25
11-Jun-2023
25-Dec-2024