Project Completion Certificate (Ground Water)
Scheme ID: 8360563 Name of Scheme: GHOSAR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2478 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 03-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24 Mtr/ 119 Mtr GHOSAR 27.346633 80.151279
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /44Mtr GHOSAR 27.346633 80.151279
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 14Mtr GHOSAR 27.346445 80.151007
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01672
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 1.606
2 HDPE Pipe PN-6, Class PE-100 75 1.514
3 HDPE Pipe PN-6, Class PE-100 90 0.533
4 HDPE Pipe PN-6, Class PE-100 110 1.153
5 HDPE Pipe PN-6, Class PE-100 140 0.613
HSC Connection
Sno. Total Nos.
1 376
Other Details
2.44
0.00
2.18
02-Apr-2023
03-Dec-2024