Scheme ID: 8360564 Name of Scheme: ARONGAPUR No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3417 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 02-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 23.8 Mtr/ 81.86 Mtr ARONGAPUR 27.284796 80.126854
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /45 Mtr ARONGAPUR 27.284796 80.126854
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 16 Mtr ARONGAPUR 27.28439 80.126426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02556
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.385
2 HDPE Pipe PN-6, Class PE-100 75 3.323
3 HDPE Pipe PN-6, Class PE-100 90 3.510
4 HDPE Pipe PN-6, Class PE-100 110 1.125
5 HDPE Pipe PN-6, Class PE-100 125 0.061
6 HDPE Pipe PN-6, Class PE-100 160 0.326
HSC Connection
Sno. Total Nos.
1 451
Other Details
3.74
0.00
2.54
01-Jun-2023
25-Dec-2024