Project Completion Certificate (Ground Water)
Scheme ID: 8360567 Name of Scheme: Banstali No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2211 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 04-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.94 M / 110.29 M Banastali 27.886832 80.782589
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 10 HP / 46 M Banastali 27.886832 80.782589
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 KL / 16 M Banastali 27.886832 80.782589
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe K-7 100 12.6
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 140 238.3
2 HDPE Pipe PN-6: Class PE-100 110 1745.5
3 HDPE Pipe PN-6: Class PE-100 90 1830.3
4 HDPE Pipe PN-6: Class PE-100 75 1368.1
5 HDPE Pipe PN-6: Class PE-100 63 4847.6
HSC Connection
Sno. Total Nos.
Other Details
1.80
0.00
1.91
20-May-2023
20-Nov-2024