| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360682 | Name of Scheme: MANDAURA VILLAGE WATER SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3411 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 11-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 19.31 MTR / 139.73 MTR | MANDAURA | 29.176417 | 73.399529 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 700 LPM / 40 MTR | MANDAURA | 29.176417 | 73.399529 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 14 MTR | MANDAURA | 29.176378 | 78.399753 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 150 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN -6 CLASS PE-100 | 125 | 1.166 | |
| 2 | HDPE PIPE PN -6 CLASS PE-100 | 110 | 1.107 | |
| 3 | HDPE PIPE PN -6 CLASS PE-100 | 90 | 0.585 | |
| 4 | HDPE PIPE PN -6 CLASS PE-100 | 75 | 1.151 | |
| 5 | HDPE PIPE PN -6 CLASS PE-100 | 63 | 6.006 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 577 |