Project Completion Certificate (Ground Water)
Scheme ID: 8360751 Name of Scheme: Manihara No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 3194 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 06-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mm X 150mm 27.01(M)/128.25(M) MANIHARA T.W-1 25.365545 83.224745
2 200mm X 150mm 30.04(M)/149.28(M) MANIHARA T.W-2 25.369739 83.236381
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 0.48 (CUM)/60 (M) MANIHARA TW-1 25.365545 83.224745
2 Submersible Borewell Pump 0.48 (CUM)/60 (M) MANIHARA TW-2 25.369739 83.236381
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 250(KL)/16(M) MANIHARA TW-1 25.365235 83.224556
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.080 From T.W to ESR
2 DI-K9 80 0.550 From T.W-2 to ESR
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.03
2 HDPE 75 1.01
3 HDPE 90 0.30
4 HDPE 110 0.76
5 HDPE 140 0.54
6 DI-K9 200 0.191
HSC Connection
Sno. Total Nos.
1 726
Other Details
4.11
4.11
4.25
10-Dec-2024
15-Dec-2024