| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360751 | Name of Scheme: Manihara | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 3194 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 06-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200mm X 150mm | 27.01(M)/128.25(M) | MANIHARA T.W-1 | 25.365545 | 83.224745 |
| 2 | 200mm X 150mm | 30.04(M)/149.28(M) | MANIHARA T.W-2 | 25.369739 | 83.236381 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Borewell Pump | 0.48 (CUM)/60 (M) | MANIHARA TW-1 | 25.365545 | 83.224745 |
| 2 | Submersible Borewell Pump | 0.48 (CUM)/60 (M) | MANIHARA TW-2 | 25.369739 | 83.236381 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVERHEAD TANK | 250(KL)/16(M) | MANIHARA TW-1 | 25.365235 | 83.224556 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 100 | 0.080 | From T.W to ESR |
| 2 | DI-K9 | 80 | 0.550 | From T.W-2 to ESR |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.03 | |
| 2 | HDPE | 75 | 1.01 | |
| 3 | HDPE | 90 | 0.30 | |
| 4 | HDPE | 110 | 0.76 | |
| 5 | HDPE | 140 | 0.54 | |
| 6 | DI-K9 | 200 | 0.191 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 726 |