| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360855 | Name of Scheme: JIGINIA MIYAON WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2780 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 11-Feb-2023 | Actual Date of Completion (Capex): 29-Jan-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 160m | Jigniya Miyaon | 26.56812 | 83.316204 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submercible | 650LPM/ 41m | Jigniya Miyaon | 26.56812 | 83.316204 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ESR | 175KL/ 12m | Jigniya Miyaon | 26.56812 | 83.316204 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 150 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.993 | |
| 2 | HDPE | 75 | 0.218 | |
| 3 | HDPE | 90 | 0.223 | |
| 4 | HDPE | 110 | 0.195 | |
| 5 | HDPE | 140 | 0.135 | |
| 6 | HDPE | 160 | 0.482 | |
| 7 | HDPE | 180 | 0.178 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |