Project Completion Certificate (Ground Water)
Scheme ID: 8360874 Name of Scheme: Budadeeh water supply scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4050 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-May-2023 Actual Date of Completion (Capex): 25-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.12/122.21 Budadeeh 24.843804 83.447765
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 54/39 Budadeeh 24.843804 83.447765
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank 225/12 Budadeeh 24.843804 83.447765
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.01 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.294 Laying Completed
2 HDPE 75 5.126 Laying Completed
3 HDPE 90 1.189 Laying Completed
4 HDPE 110 0.93 Laying Completed
5 HDPE 140 0.968 Laying Completed
6 HDPE 200 0.64 Laying Completed
HSC Connection
Sno. Total Nos.
1 728
Other Details
3.07
0.00
2.91
24-Dec-2024
06-May-2025