Project Completion Certificate (Ground Water)
Scheme ID: 8360885 Name of Scheme: CHEHLA VILLAGE WATER SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 5118 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Apr-2025 Actual Date of Completion (Capex): 01-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 200 0.02
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 9.58
2 HDPE PIPE PN -6: CLASS PE -100 75 1.26
3 HDPE PIPE PN -6: CLASS PE -100 90 0.53
4 HDPE PIPE PN -6: CLASS PE -100 110 0.88
5 HDPE PIPE PN -6: CLASS PE -100 140 0.06
6 HDPE PIPE PN -6: CLASS PE -100 160 1.87
7 HDPE PIPE PN -6: CLASS PE -100 200 0.27
HSC Connection
Sno. Total Nos.
Other Details
3.19
3.19
3.09
31-Jul-2025
01-Aug-2025