Project Completion Certificate (Ground Water)
Scheme ID: 8360890 Name of Scheme: DHELA AHIR VILLAGE WATER SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4074 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 08-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.15 MTR / 181.73 MTR DHELA AHIR 29.182704 78.428708
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10 HP 600 LPM / 40 MTR DHELA AHIR 29.182704 78.428708
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINC ALLUMINIUM OVER HEAD TANK 175 KL / 14 MTR DHELA AHIR 29.182625 78.42868
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 125 0.201
2 HDPE PIPE PN-6 CLASS PE-100 160 0.073
3 HDPE PIPE PN-6 CLASS PE-100 140 0.113
4 HDPE PIPE PN-6 CLASS PE-100 110 0.417
5 HDPE PIPE PN-6 CLASS PE-100 90 0.096
6 HDPE PIPE PN-6 CLASS PE-100 75 0.186
7 HDPE PIPE PN-6 CLASS PE-100 63 5.540
HSC Connection
Sno. Total Nos.
1 433
Other Details
2.06
2.06
2.06
06-Jun-2024
07-Jun-2024