Project Completion Certificate (Ground Water)
Scheme ID: 8360938 Name of Scheme: KALANPUR BUZURG (111951) GRAMPANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 1812 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.00 Mt / 126.00 Mtr Kalanpur Buzurg 29.486108 78.294175
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 7.50 HP 400 LPM / 39 Mtr Kalanpur Buzurg 29.486108 78.294175
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL /10.00 mtr Kalanpur Buzurg 29.486192 78.294025
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class 140 0.852
2 HDPE Pipe PN-6 Class 110 0.086
3 HDPE Pipe PN-6 Class 90 0.778
4 HDPE Pipe PN-6 Class 63 4.761
HSC Connection
Sno. Total Nos.
1 362
Other Details
1.69
1.69
1.69
08-Jun-2024
09-Jun-2024