Scheme ID: 8361017 Name of Scheme: BASANTPUR VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4356 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 27-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 47.09 MTR / 100.00 MTR BASANTPUR 29.083985 78.135768
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 150 HP 950 LPM / 40 MTR BASANTPUR 29.083985 78.135768
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 14 MTR BASANTPUR 29.08329 78.135981
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 160 0.213
2 HDPE PIPE PN-6 CLASS PE-100 140 0.017
3 HDPE PIPE PN-6 CLASS PE-100 125 0.158
4 HDPE PIPE PN-6 CLASS PE-100 110 0.229
5 HDPE PIPE PN-6 CLASS PE-100 90 0.665
6 HDPE PIPE PN-6 CLASS PE-100 75 0.925
7 HDPE PIPE PN-6 CLASS PE-100 63 7.286
HSC Connection
Sno. Total Nos.
1 627
Other Details
3.42
3.42
2.83
26-Aug-2024