Project Completion Certificate (Ground Water)
Scheme ID: 8361040 Name of Scheme: Partappur Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4500 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 01-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30/140.82 Prattappur 26.8239 83.2691
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 60/43 Prattappur 26.8239 83.2691
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 250/16 Prattappur 26.8239 83.2691
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.012 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.16 Laying Completed
2 HDPE 75 3.31 Laying Completed
3 HDPE 90 1.56 Laying Completed
4 HDPE 110 0.56 Laying Completed
5 HDPE 140 0.46 Laying Completed
6 HDPE 160 0.23 Laying Completed
7 HDPE 200 0.94 Laying Completed
HSC Connection
Sno. Total Nos.
1 503
Other Details
3.01
0.00
3.00
09-May-2024
01-Jun-2026