Project Completion Certificate (Ground Water)
Scheme ID: 8361045 Name of Scheme: Jaurhar Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2800 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-May-2023 Actual Date of Completion (Capex): 19-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.08/132.09 JAURHAR 26.845372 83.431319
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 39/40 JAURHAR 26.845372 83.431319
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/12 JAURHAR 26.84534 83.430568
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.435 COMPLETED
2 HDPE 75 1.795 COMPLETED
3 HDPE 90 0.172 COMPLETED
4 HDPE 110 0.209 COMPLETED
5 HDPE 140 0.323 COMPLETED
6 HDPE 160 0.293 COMPLETED
HSC Connection
Sno. Total Nos.
1 382
Other Details
2.14
0.00
2.05
18-Feb-2024
22-Nov-2024