| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361068 | Name of Scheme: Bak Sunri, Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1550 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 11-May-2023 | Actual Date of Completion (Capex): 25-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 36.10/103.82 | Bak Sunri | 26.520008 | 83.513779 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 24/40 | Bak Sunri | 26.519953 | 83.51383 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 50/12 | Bak Sunri | 26.519987 | 83.513646 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.012 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.032 | Completed |
| 2 | HDPE | 75 | 1.187 | Completed |
| 3 | HDPE | 90 | 0.801 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 360 |