Project Completion Certificate (Ground Water)
Scheme ID: 8361068 Name of Scheme: Bak Sunri, Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-May-2023 Actual Date of Completion (Capex): 25-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.10/103.82 Bak Sunri 26.520008 83.513779
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 24/40 Bak Sunri 26.519953 83.51383
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 50/12 Bak Sunri 26.519987 83.513646
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.012 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.032 Completed
2 HDPE 75 1.187 Completed
3 HDPE 90 0.801 Completed
HSC Connection
Sno. Total Nos.
1 360
Other Details
1.54
0.00
1.59
24-Jun-2025
01-Apr-2025