Project Completion Certificate (Ground Water)
Scheme ID: 8361076 Name of Scheme: Unaula Doim Muti Villages Water Supply scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2940 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 07-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.17/95.43 Unaula Doim 26.7963 83.4631
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 27/41 Unaula Doim 26.7963 83.4631
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/14 Unaula Doim 26.7963 83.4631
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Pipe Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.88 Laying Completed
2 HDPE 75 4.29 Laying Completed
3 HDPE 90 0.201 Laying Completed
4 HDPE 110 0.289 Laying Completed
5 HDPE 140 1.649 Laying Completed
HSC Connection
Sno. Total Nos.
1 280
Other Details
2.42
0.00
3.20
06-Sep-2024
11-Dec-2024