Project Completion Certificate (Ground Water)
Scheme ID: 8361105 Name of Scheme: Nargad shivadatt singh WATER SUPPLY SCHEME No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 1923 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 01-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
HSC Connection
Sno. Total Nos.
Other Details
2.53
0.00
2.48
01-Aug-2023
19-Nov-2024