| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361226 | Name of Scheme: Baruali, Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 2850 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-May-2023 | Actual Date of Completion (Capex): 14-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.05/89.77 | Baruali | 26.76257 | 83.482329 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 42/43 | Baruali | 26.76257 | 83.482329 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 175/16 | Baruali | 26.762478 | 83.482157 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.035 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.465 | Completed |
| 2 | HDPE | 75 | 5.511 | Completed |
| 3 | HDPE | 90 | 1.139 | Completed |
| 4 | HDPE | 110 | 0.673 | Completed |
| 5 | HDPE | 140 | 0.814 | Completed |
| 6 | HDPE | 200 | 0.367 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 488 |