Project Completion Certificate (Ground Water)
Scheme ID: 8361246 Name of Scheme: Sarsara Bujurg Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 11
Total Population Covered: 2360 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 29-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 167 Sarsada Bujurg 26.381174 83.305005
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submercible Pump 450 LPM/ 45m Sarsada Bujurg 26.381174 83.305005
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ESR 150 KL/ 16m Sarsada Bujurg 26.381174 83.305005
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.17
2 HDPE 75 0.099
3 HDPE 90 0.973
4 HDPE 110 0.408
5 HDPE 125 1.424
6 HDPE 140 0.403
HSC Connection
Sno. Total Nos.
1 456
Other Details
2.89
0.00
2.80
29-Jul-2023
19-Nov-2024