Project Completion Certificate (Ground Water)
Scheme ID: 8361712 Name of Scheme: ANWAS DUGAIYA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2420 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.05/93.07 ANWAS DUGAIYA 28.034103 80.165228
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 30.60/45 ANWAS DUGAIYA 28.034103 80.165228
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150/16 ANWAS DUGAIYA 28.033932 80.165067
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6 KG 63 4.165
2 HDPE / 6 KG 75 0.161
3 HDPE / 6 KG 90 0.261
4 HDPE / 6 KG 110 0.790
5 HDPE / 6 KG 140 1.595
6 HDPE / 6 KG 160 0.426
HSC Connection
Sno. Total Nos.
1 475
Other Details
2.30
0.00
2.30
30-Dec-2023
06-Dec-2024