| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361712 | Name of Scheme: ANWAS DUGAIYA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2420 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.05/93.07 | ANWAS DUGAIYA | 28.034103 | 80.165228 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP - 1 | 30.60/45 | ANWAS DUGAIYA | 28.034103 | 80.165228 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 150/16 | ANWAS DUGAIYA | 28.033932 | 80.165067 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6 KG | 63 | 4.165 | |
| 2 | HDPE / 6 KG | 75 | 0.161 | |
| 3 | HDPE / 6 KG | 90 | 0.261 | |
| 4 | HDPE / 6 KG | 110 | 0.790 | |
| 5 | HDPE / 6 KG | 140 | 1.595 | |
| 6 | HDPE / 6 KG | 160 | 0.426 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 475 |