| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361848 | Name of Scheme: MADHUPUR | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2145 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Sep-2021 | Actual Date of Completion (Capex): 25-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.08 Mtr. /112.15 Mtr. | Madhupur | 26.484379* | 79.494387* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 29.1(M3/Hr.)/82Mtr. | Madhupur | 26.484379* | 79.494387* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | Madhupur | 26.484519* | 79.494302* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 16.90 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3609.60 | |
| 2 | HDPE | 75 | 596 | |
| 3 | HDPE | 90 | 609 | |
| 4 | HDPE | 110 | 228 | |
| 5 | HDPE | 140 | 1014.5 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 447 |