Project Completion Certificate (Ground Water)
Scheme ID: 8361850 Name of Scheme: HASANPUR BILLOCH VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3435 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Aug-2021 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 53.09 MTR / 101.25 MTR HASANPUR BILOCH 29.09009 78.485172
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 7.50 HP 500 LPM / 40 MTR HASANPUR BILLOCH 29.09009 78.485172
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC OVER HEAD TANK 150 KL/ 14 MTR HASANPUR BILLOCH 29.09009 78.485172
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.048
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-06 PE-100 140 1.507
2 HDPE PIPE PN-06 PE-100 90 0.839
3 HDPE PIPE PN-06 PE-100 75 0.497
4 HDPE PIPE PN-06 PE-100 63 4.459
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.74
1.68
1.74
08-Jun-2024
09-Jun-2024