Project Completion Certificate (Ground Water)
Scheme ID: 8361875 Name of Scheme: SURAYYA MUVAKKIL PUR No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1099 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16(m) / 93.8(m) Surayya Muvakkilpur 26.115295 81.411091
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400(M³) / 41(Mtr.) Surayya Muvakkilpur 26.115295 81.411091
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 100 (KL) / 12(Mtr.) Surayya Muvakkilpur 26.115295 81.411091
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.126
2 HDPE 75 1.786
3 HDPE 90 0.178
4 HDPE 110 0.258
5 HDPE 125 1.046
HSC Connection
Sno. Total Nos.
1 235
Other Details
1.85
0.00
1.73
24-May-2025
10-Jun-2025