| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361896 | Name of Scheme: BHAGAUTIPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1960 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 25-Apr-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18.02 mtr/ 116.03 mtr | BHAGAUTIPUR | 26.42592* | 79.546436* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 24(M3/Hr.)/68Mtr. | BHAGAUTIPUR | 26.42592* | 79.546436* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | BHAGAUTIPUR | 26.425896* | 79.54636* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 21.55 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4086 | |
| 2 | HDPE | 75 | 454 | |
| 3 | HDPE | 90 | 133 | |
| 4 | HDPE | 110 | 70 | |
| 5 | HDPE | 140 | 473 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 375 |