Project Completion Certificate (Ground Water)
Scheme ID: 8361938 Name of Scheme: KUNDALIYA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2186 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mm X 150mm 27.07m/133.37m KUNDALIYA 25.220142000 83.079023000
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 0.448(CUM)/55 (M) KUNDALIYA 25.220142000 83.079023000
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 200(KL)/12(M) KUNDALIYA 25.220606 83.087975
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.033 T.W to ESR
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.67
2 HDPE 75 3.35
3 HDPE 90 0.445
4 HDPE 110 0.183
5 HDPE 140 0.156
6 HDPE 160 0.101
HSC Connection
Sno. Total Nos.
1 389
Other Details
2.71
2.71
2.91
02-Dec-2024
11-Dec-2024