| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361945 | Name of Scheme: MANIYARPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 384 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Dec-2034 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 x 150 m | 27m/109.7m | Maniyarpur | 25.348314 | 83.317631 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Borewell Pump | 31.74 | Maniyarpur | 25.348314 | 83.317631 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVERHEAD TANK | 200(KL)/16(M) | Maniyarpur | 25.348162 | 83.317441 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 80 | 25 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.87 | |
| 2 | HDPE | 75 | 0.867 | |
| 3 | HDPE | 90 | 0.123 | |
| 4 | HDPE | 110 | 0.586 | |
| 5 | HDPE | 140 | 2.298 | |
| 6 | HDPE | 160 | 0.091 | |
| 7 | DI-K7 | 200 | 0.027 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 364 |