Project Completion Certificate (Ground Water)
Scheme ID: 8361945 Name of Scheme: MANIYARPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 384 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2034
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200 x 150 m 27m/109.7m Maniyarpur 25.348314 83.317631
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 31.74 Maniyarpur 25.348314 83.317631
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 200(KL)/16(M) Maniyarpur 25.348162 83.317441
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 80 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.87
2 HDPE 75 0.867
3 HDPE 90 0.123
4 HDPE 110 0.586
5 HDPE 140 2.298
6 HDPE 160 0.091
7 DI-K7 200 0.027
HSC Connection
Sno. Total Nos.
1 364
Other Details
28579330.00
0.24
26191074.00
16-Nov-2023
01-Dec-2024