Project Completion Certificate (Ground Water)
Scheme ID: 8361972 Name of Scheme: ROSHANMAU No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2290 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1195.70
2 HDPE 75 1025.30
3 HDPE 90 695.5
4 HDPE 110 688.50
5 HDPE 140 603
6 HDPE 160 560
7 HDPE 180 528.20
HSC Connection
Sno. Total Nos.
Other Details
2.68
1.96
1.96
15-Feb-2024
01-Mar-2024