Project Completion Certificate (Ground Water)
Scheme ID: 8361975 Name of Scheme: KAMHARI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1581 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Apr-2025 Actual Date of Completion (Capex): 20-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mmX150mm 29.90m/140.91m Kamhari 25.325331 83.291992
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 18.89(CUM)/55mtr Kamhari 25.325331 83.291992
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 100KL/12M Kamhari 25.325391 83.292019
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 80 0.076
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.951
2 HDPE 75 0.406
3 HDPE 90 0.064
4 HDPE 110 0.028
HSC Connection
Sno. Total Nos.
1 277
Other Details
2.60
2.60
0.00
03-Mar-2025
25-Dec-2025