| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361985 | Name of Scheme: SARY PAKWAN | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2495 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200mm X 150mm | 30.02(M)/144.91(M) | SARY PAKWAN | 25.282909 | 83.263814 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Borewell Pump | 0.602(CUM)/64(M) | SARY PAKWAN | 25.282909 | 83.263814 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVERHEAD TANK | 200(KL)/20(M) | SARY PAKWAN | 25.282909 | 83.263814 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 25 | From T.W to ESR |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.55 | |
| 2 | HDPE | 75 | 1.51 | |
| 3 | HDPE | 90 | 0.66 | |
| 4 | HDPE | 110 | 0.80 | |
| 5 | HDPE | 140 | 0.46 | |
| 6 | HDPE | 160 | 0.072 | |
| 7 | DI-K9 | 200 | 0.03 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 536 |