Scheme ID: 8361985 Name of Scheme: SARY PAKWAN No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2495 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mm X 150mm 30.02(M)/144.91(M) SARY PAKWAN 25.282909 83.263814
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 0.602(CUM)/64(M) SARY PAKWAN 25.282909 83.263814
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 200(KL)/20(M) SARY PAKWAN 25.282909 83.263814
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 25 From T.W to ESR
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.55
2 HDPE 75 1.51
3 HDPE 90 0.66
4 HDPE 110 0.80
5 HDPE 140 0.46
6 HDPE 160 0.072
7 DI-K9 200 0.03
HSC Connection
Sno. Total Nos.
1 536
Other Details
3.16
3.16
3.33
10-Dec-2024