Project Completion Certificate (Ground Water)
Scheme ID: 8361986 Name of Scheme: URSAN No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4095 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2021 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 38/161.54 Ursan 26.377979 79.742944
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 95.70/54 Ursan 26.377979 79.742944
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/12 Ursan 26.377979 79.742944
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.020 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.292 As per Site
2 HDPE 75 2.761 As per Site
3 HDPE 90 2.268 As per Site
4 HDPE 110 0.596 As per Site
5 HDPE 125 0.363 As per Site
6 HDPE 140 0.542 As per Site
7 HDPE 160 0.389 As per Site
8 HDPE 180 0.855 As per Site
HSC Connection
Sno. Total Nos.
1 848
Other Details
3.24
2.89
2.89
31-Dec-2023
01-Jan-2024