Project Completion Certificate (Ground Water)
Scheme ID: 8361988 Name of Scheme: NINHAURA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2021 Actual Date of Completion (Capex): 14-Sep-2021
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.842
2 HDPE 75 1.694
3 HDPE 90 1.073
4 HDPE 110 0.286
5 HDPE 140 0.1595
HSC Connection
Sno. Total Nos.
Other Details
2.49
2.12
2.20
30-Jun-2023
01-Jul-2023