Project Completion Certificate (Ground Water)
Scheme ID: 8362012 Name of Scheme: AYAK GHARA 0399 No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2820 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 02-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24 Mtr/ 105.1 Mtr AYAK GHARA 0399 27.359026 80.411084
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /45Mtr AYAK GHARA 0399 27.359026 80.411084
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 16 Mtr AYAK GHARA 0399 27.358965 80.411204
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.02224
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.491
2 HDPE Pipe PN-6, Class PE-100 75 4.077
3 HDPE Pipe PN-6, Class PE-100 90 1.365
4 HDPE Pipe PN-6, Class PE-100 110 1.071
5 HDPE Pipe PN-6, Class PE-100 125 1.950
6 HDPE Pipe PN-6, Class PE-100 140 0.068
HSC Connection
Sno. Total Nos.
1 545
Other Details
2.79
0.00
2.38
01-Jun-2023
24-Dec-2024