Scheme ID: 8362074 Name of Scheme: ALAMPUR BUZURG No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2274 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Mar-2023 Actual Date of Completion (Capex): 10-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 96.91 Mtr / 31.21 Mtr ALAMPUR BUZURG 28.913646 77.775282
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 LPM / 50 Mtr ALAMPUR BUZURG 28.913646 77.775282
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 Kl / 12 M ALAMPUR BUZURG 28.913646 77.775282
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.940
2 HDPE 90 0.089
3 HDPE 110 0.139
HSC Connection
Sno. Total Nos.
1 471
Other Details
2.29
2.29
1.80
28-Apr-2023