Project Completion Certificate (Ground Water)
Scheme ID: 8362103 Name of Scheme: SALEMPUR BUZURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.06/71.72 SALEMPUR BUZURG 27.574789 79.355895
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 25.20/45 SALEMPUR BUZURG 27.574789 79.355895
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200/18 SALEMPUR BUZURG 27.574827 79.355840
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 8.910
2 HDPE / 6KG 75 1.678
3 HDPE / 6KG 90 1.410
4 HDPE / 6KG 110 0.395
5 HDPE / 6KG 140 0.036
HSC Connection
Sno. Total Nos.
1 350
Other Details
2.22
0.00
2.22
30-Dec-2023
06-Dec-2024