| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8362123 | Name of Scheme: CHURAWANPUR | No. of Villages: 1 | No. of Habitation Covered: 12 |
| Total Population Covered: 2160 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-May-2023 | Actual Date of Completion (Capex): 22-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X200 | 9/63.72 | CHURAWANPUR | 25.805974 | 82.563382 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-12.5HP | 500/48.30 | CHURAWANPUR | 25.805974 | 82.563382 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150KL/14M | CHURAWANPUR | 25.805932 | 82.563415 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 0.043 | |
| 2 | HDPE PIPE PN-6 | 140 | 1.289 | |
| 3 | HDPE PIPE PN-6 | 110 | 0.670 | |
| 4 | HDPE PIPE PN-6 | 90 | 0.504 | |
| 5 | HDPE PIPE PN-6 | 75 | 0.666 | |
| 6 | HDPE PIPE PN-6 | 63 | 7.801 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 354 |