Project Completion Certificate (Ground Water)
Scheme ID: 8362167 Name of Scheme: GYANPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3288 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Jan-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 95.05 Mtr / 33.69 Mtr GYANPUR 29.001691 77.820159
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 LPM / 50 Mtr GYANPUR 29.001691 77.820159
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 Kl / 12 M GYANPUR 29.001691 77.820159
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0182
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.596
2 HDPE 90 0.218
3 HDPE 110 0.148
4 HDPE 125 0.134
5 HDPE 160 0.034
6 HDPE 180 0.610
HSC Connection
Sno. Total Nos.
1 533
Other Details
2.97
2.97
2.35
05-May-2023
07-Oct-2024