Project Completion Certificate (Ground Water)
Scheme ID: 8362203 Name of Scheme: AKABARPUR PASNAMAU No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2662 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 20-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 17 Mtr/ 118.80 Mtr AKABARPUR PASNAMAU 27.209171 80.074306
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /42Mtr AKABARPUR PASNAMAU 27.209171 80.074306
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 12Mtr AKABARPUR PASNAMAU 27.209127 80.074196
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02302
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.354
2 HDPE Pipe PN-6, Class PE-100 75 1.279
3 HDPE Pipe PN-6, Class PE-100 90 0.782
4 HDPE Pipe PN-6, Class PE-100 110 0.718
5 HDPE Pipe PN-6, Class PE-100 140 0.821
6 HDPE Pipe PN-6, Class PE-100 160 0.425
7 HDPE Pipe PN-6, Class PE-100 180 0.045
HSC Connection
Sno. Total Nos.
1 503
Other Details
2.55
0.00
1.89
19-Jul-2023
24-Dec-2024