Project Completion Certificate (Ground Water)
Scheme ID: 8362298 Name of Scheme: AIMI W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Mar-2023 Actual Date of Completion (Capex): 23-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.02/84.25 Aimi 28.675314 79.201836
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 38.4/44 Aimi 28.675314 79.201836
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 200/16 Aimi 28.675314 79.201836
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 150 .017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 .207
2 HDPE Pipe PN-6: Class PE-100 75 .659
3 HDPE Pipe PN-6: Class PE-100 63 4.741
4 HDPE Pipe PN-6: Class PE-100 110 1.839
5 HDPE Pipe PN-6: Class PE-100 125 .871
6 HDPE Pipe PN-6: Class PE-100 140 .4123
7 HDPE Pipe PN-6: Class PE-100 160 .223
HSC Connection
Sno. Total Nos.
1 521
Other Details
2.03
0.00
0.00
25-Nov-2023
26-Nov-2023