Project Completion Certificate (Ground Water)
Scheme ID: 8362351 Name of Scheme: BIJOLI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 6873 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 16-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 40.07 Mtr / 91.6 Mtr BIJOLI 28.863823 77.75918
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1400 LPM / 54 Mtr BIJOLI 28.863823 77.75918
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400 Kl / 16 M BIJOLI 28.863823 77.75918
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0259
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 13.189
2 HDPE 90 1.353
3 HDPE 110 0.383
4 HDPE 125 0.207
5 HDPE 140 0.232
HSC Connection
Sno. Total Nos.
1 1407
Other Details
4.93
4.93
4.04
02-Feb-2025
03-Feb-2025