Project Completion Certificate (Ground Water)
Scheme ID: 8362365 Name of Scheme: CHINDAURI TAPPA LAWAR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4271 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 16-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 39.32 Mtr / 102.2 Mtr CHINDAURI TAPPA LAWAR 29.117640 77.799331
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 850 LPM / 54 Mtr CHINDAURI TAPPA LAWAR 29.117640 77.799331
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 Kl / 16 M CHINDAURI TAPPA LAWAR 29.117640 77.799331
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0207
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.172
2 HDPE 90 0.803
3 HDPE 110 0.441
4 HDPE 125 0.137
5 HDPE 140 0.497
6 HDPE 180 0.586
HSC Connection
Sno. Total Nos.
1 777
Other Details
3.36
3.36
2.72
02-Feb-2025
03-Feb-2025