Project Completion Certificate (Ground Water)
Scheme ID: 8362393 Name of Scheme: NAYA GAON DEORIYA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 05-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.09 Mtr/ 106.46 Mtr NAYA GAON DEORIYA 27.337368 80.392754
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.5 M³ per Min /45Mtr NAYA GAON DEORIYA 27.337368 80.392754
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/ 16 Mtr NAYA GAON DEORIYA 27.335799 80.393136
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02912
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.431
2 HDPE Pipe PN-6, Class PE-100 75 1.993
3 HDPE Pipe PN-6, Class PE-100 90 0.749
4 HDPE Pipe PN-6, Class PE-100 110 0.959
5 HDPE Pipe PN-6, Class PE-100 125 0.778
6 HDPE Pipe PN-6, Class PE-100 140 0.018
7 HDPE Pipe PN-6, Class PE-100 160 0.029
HSC Connection
Sno. Total Nos.
Other Details
2.22
0.00
1.92
04-May-2023
24-Dec-2024